Legislation Details

File #: 2024-6361    Version: 1 Name:
Type: Regular Agenda Status: Agenda Ready
File created: 8/29/2024 In control: Board of County Commissioners
On agenda: 9/24/2024 Final action:
Title: Burnt Store Road East-West Connector Preferred Alternative
Attachments: 1. BSR E-W Connector BCC presentation 9.24.24
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Title
title

Burnt Store Road East-West Connector Preferred Alternative

end

recommendation

Public Works

a) Presentation; and

b) Approve by motion the Burnt Store Road East-West connector preferred alternative.

end

 

Budgeted Action:

No action needed.

 

Background:

body

The traffic modeling study identified future capacity needs along the Burnt Store corridor taking into account potential growth in the area. The study determined the need for an East-West Connector from Burnt Store Road to US 41. A preliminary engineering study investigated several alignments for this connector and established a preferred alignment. The engineering study considered the following: alternative alignments, typical roadway sections, right-of-way, access management, environmental/stormwater ponds, and costs.

end