Recommended Action:
a) Approve Amendment 1 to Contract #23-302, Design Rampart Boulevard Sidewalks Phases 1, 2, and 3, with DRMP, Inc., of Fort Myers, Florida, for supplemental design work in the Phase 1 portion of this project in the amount of $19,095; and
b) Authorize the Chairman to sign Amendment 1.
end
budget
Budgeted Action:
No action needed. Budgeted in the Capital Improvement Project “Regional Bicycle-Pedestrian Trails” as approved in the FY26 budget process. Funding is supplied from the 2020 Sales Tax Extension.
end
BACKGROUND (Why is this Action Necessary, and What Action will be accomplished)
body
Background:
On June 13, 2023, the Board approved the ranking and negotiations for RFP #23-302, Design Rampart Boulevard Sidewalks Phases 1, 2, and 3, with DRMP, Inc. A contract was negotiated and fully executed on September 5, 2024.
This Amendment is for supplemental design work in the phase 1 portion of the project. The primary project objective is to design and permit an 8-foot concrete sidewalk on the north side of Rampart Boulevard between Victoria Estates Street and Navigator Road, approximately 2.4 miles. As a part of Task 1.4 of the original agreement, the Consultant coordinated with Florida Department of Transportation (FDOT) to finalize the scope for the work required to design & permit the sidewalk across their bridge that spans over Interstate 75. (existing bridge No. 010088). They concluded that a vertical separation must be present and the best way to achieve that is to pour a concrete sidewalk on top of the existing bridge.